{"id":52386,"date":"2019-02-06T06:49:01","date_gmt":"2019-02-06T06:49:01","guid":{"rendered":"http:\/\/en.bornomalanews.com\/?p=52386"},"modified":"2019-02-06T06:49:01","modified_gmt":"2019-02-06T06:49:01","slug":"pm-opens-6-power-plants-9-grid-stations","status":"publish","type":"post","link":"https:\/\/en.bornomalanews.com\/?p=52386","title":{"rendered":"PM opens 6 power plants, 9 grid stations"},"content":{"rendered":"<div class=\"some-class-name2\">\n<p style=\"text-align: left;\"><img class=\"wp-image-52387 aligncenter\" src=\"http:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721-300x195.jpg\" alt=\"\" width=\"838\" height=\"545\" srcset=\"https:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721-300x195.jpg 300w, https:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721-768x500.jpg 768w, https:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721-696x453.jpg 696w, https:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721-645x420.jpg 645w, https:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721.jpg 800w\" sizes=\"(max-width: 838px) 100vw, 838px\" \/>Dhaka: As much as 1062 megawatts (MWs) of electricity have been added to the country\u2019s national grid as Prime Minister Sheikh Hasina today inaugurated six power plants and nine grid substations.<\/p>\n<p style=\"text-align: left;\">The premier opened these power plants and grid substations through a videoconferencing from her official Ganabhaban residence\u00a0this morning.<\/p>\n<p style=\"text-align: left;\">Through the same function, Sheikh Hasina also launched the power supply to Sandwip upazila in Chattogram through submarine cable, the first of its kind in the country, and cent percent electrification in 12 upazilas.<\/p>\n<p style=\"text-align: left;\">The six power plants inaugurated by the prime minister are Sirajganj 282MW Simple Cycle Power Plant, Bhola 225MW Combined Cycle Power Plant, Chandpur 200MW Power Plant, Ashuganj 150MW Power Plant, Rupsha in Khulna 105MW Power Plant, Julda in Chattogram 100MW Power Plant (3rd unit).<\/p>\n<p style=\"text-align: left;\">The nine grid substations are Ramganj, Barishal (North), Baroiyerhat, Shikalbaha, Jaldhaka, Sunamganj, Bianibazar, Rangamati and Matarbari.<\/p>\n<p style=\"text-align: left;\">The 12 upazilas which came under cent percent power coverage are Harinakundu, Thakurgaon Sadar, Baliadangi, Goalanda, Kalukhali, Bamna, Lakhai, Shaistaganj, Ajmiriganj, Bahubal, Melandah and Islampur.<\/p>\n<p style=\"text-align: left;\">According to officials of the power ministry, a total of 306 upazilas have so far been brought under cent percent electricity coverage.<\/p>\n<p style=\"text-align: left;\">Of them, cent percent electrification was inaugurated in 263 upazilas, while it will be launched in the rest of 43 upazilas by June this year, the officials said.<\/p>\n<p style=\"text-align: left;\">PM\u2019s Energy Adviser Dr Towfik-e-Elahi Chowdhury, State Minister for Power, Energy and Mineral Resources Nasrul Hamid Bipu spoke at the function.<\/p>\n<p style=\"text-align: left;\">Power Division Secretary Dr Ahmad Kaikaus gave an overview on the overall development in the power sector, while PM\u2019s Principal Secretary Dr Nojibur Rahman moderated the function.<\/p>\n<p style=\"text-align: left;\">Dr Kaikaus said as many as 92 per cent people have been brought under electricity coverage as the country achieved capability of producing 20,854MW electricity.<\/p>\n<p style=\"text-align: left;\">\u201cBangladesh has now been turned into a power surplus country from a deficit one thanks to inauguration of 100 new power plants over the last 10 years,\u201d he said.<\/p>\n<p style=\"text-align: left;\">Former ministers and Awami League senior leaders Tofail Ahmed and Engineer Mosharraf Hossain, former state minister Mirza Azam, ex-deputy minister Abdullah Islam Al Jakob and parliament members of the concerned areas were present at Ganabhaban.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dhaka: As much as 1062 megawatts (MWs) of electricity have been added to the country\u2019s national grid as Prime Minister Sheikh Hasina today inaugurated six power plants and nine grid substations. The premier opened these power plants and grid substations through a videoconferencing from her official Ganabhaban residence\u00a0this morning. Through the same function, Sheikh Hasina [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":52387,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[12,2],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v16.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/en.bornomalanews.com\/?p=52386\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PM opens 6 power plants, 9 grid stations - Bornomalanews.com\" \/>\n<meta property=\"og:description\" content=\"Dhaka: As much as 1062 megawatts (MWs) of electricity have been added to the country\u2019s national grid as Prime Minister Sheikh Hasina today inaugurated six power plants and nine grid substations. The premier opened these power plants and grid substations through a videoconferencing from her official Ganabhaban residence\u00a0this morning. Through the same function, Sheikh Hasina [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/en.bornomalanews.com\/?p=52386\" \/>\n<meta property=\"og:site_name\" content=\"Bornomalanews.com\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/bornomalanewscom-101666198219917\" \/>\n<meta property=\"article:published_time\" content=\"2019-02-06T06:49:01+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"521\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/en.bornomalanews.com\/#website\",\"url\":\"https:\/\/en.bornomalanews.com\/\",\"name\":\"Bornomalanews.com\",\"description\":\"::  Web Portal publish from New York ::\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/en.bornomalanews.com\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/en.bornomalanews.com\/?p=52386#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721.jpg\",\"contentUrl\":\"https:\/\/en.bornomalanews.com\/wp-content\/uploads\/2019\/02\/120848ceb07a0f5db1e2154b9da7f65ea67435-5ae57b0a69721.jpg\",\"width\":800,\"height\":521},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/en.bornomalanews.com\/?p=52386#webpage\",\"url\":\"https:\/\/en.bornomalanews.com\/?p=52386\",\"name\":\"PM opens 6 power plants, 9 grid stations - Bornomalanews.com\",\"isPartOf\":{\"@id\":\"https:\/\/en.bornomalanews.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/en.bornomalanews.com\/?p=52386#primaryimage\"},\"datePublished\":\"2019-02-06T06:49:01+00:00\",\"dateModified\":\"2019-02-06T06:49:01+00:00\",\"author\":{\"@id\":\"https:\/\/en.bornomalanews.com\/#\/schema\/person\/87ffb085aa40cebbbb57d297e1d3b17b\"},\"breadcrumb\":{\"@id\":\"https:\/\/en.bornomalanews.com\/?p=52386#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/en.bornomalanews.com\/?p=52386\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/en.bornomalanews.com\/?p=52386#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/en.bornomalanews.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PM opens 6 power plants, 9 grid stations\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/en.bornomalanews.com\/#\/schema\/person\/87ffb085aa40cebbbb57d297e1d3b17b\",\"name\":\"Dhaka Desk\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/en.bornomalanews.com\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/64d9231be0f6ac72283482b226074fc0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/64d9231be0f6ac72283482b226074fc0?s=96&d=mm&r=g\",\"caption\":\"Dhaka Desk\"},\"sameAs\":[\"http:\/\/www.domaist.com\",\"https:\/\/www.facebook.com\/bornomalanewscom-101666198219917\"],\"url\":\"https:\/\/en.bornomalanews.com\/?author=7\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","amp_enabled":true,"_links":{"self":[{"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=\/wp\/v2\/posts\/52386"}],"collection":[{"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=52386"}],"version-history":[{"count":1,"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=\/wp\/v2\/posts\/52386\/revisions"}],"predecessor-version":[{"id":52388,"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=\/wp\/v2\/posts\/52386\/revisions\/52388"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=\/wp\/v2\/media\/52387"}],"wp:attachment":[{"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=52386"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=52386"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/en.bornomalanews.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=52386"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}